In Eclipse Vert.x version 4.3.0 to 4.5.9, the gRPC server does not limit the maximum length of message payload (Maven GAV: io.vertx:vertx-grpc-server and io.vertx:vertx-grpc-client). This is fixed in the 4.5.10 version. Note this does not affect the Vert.x gRPC server based grpc-java and Netty libraries (Maven GAV: io.vertx:vertx-grpc)
https://gitlab.eclipse.org/security/cve-assignement/-/issues/31
Published: 2024-09-04
Updated: 2024-09-12
Base Score: 7.8
Vector: CVSS2#AV:N/AC:L/Au:N/C:N/I:N/A:C
Severity: High
Base Score: 7.5
Vector: CVSS:3.0/AV:N/AC:L/PR:N/UI:N/S:U/C:N/I:N/A:H
Severity: High
Base Score: 6.9
Vector: CVSS:4.0/AV:N/AC:L/AT:N/PR:N/UI:N/VC:N/VI:N/VA:L/SC:N/SI:N/SA:N
Severity: Medium
EPSS: 0.00161